AIZAWL IRRIGATION DIVISION | |||||||
As on March, 2020 | |||||||
i) Aizawl Sub-Division | |||||||
1 | Salem M.I.Project | Salempara | 1991-1992 | 21 | 20 | 40 | 605,000.00 |
2 | Rawhak M.I.Project | Sihphir | 1992-1993 | 8 | 5 | 10 | 161,000.00 |
3 | Sihpuilui M.I.Project | Chite | 1998-1999 | 10 | 8 | 16 | 403,700.00 |
4 | Zirapalui M.I.Project | Khawhnai | 1998-1999 | 12 | 10 | 20 | 343,000.00 |
5 | Lungtatlui M.I.Project | Khawhnai | 1998-1999 | 31 | 26 | 52 | 919,100.00 |
6 | Kaihzawl M.I.Project | Keifang | 1999-2000 | 62 | 50 | 100 | 2,636,400.00 |
7 | Likphai M.I.Project | Sialsuk | 1999-2000 | 59 | 48 | 96 | 2,971,000.00 |
8 | Tuiriza M.I.Project | Phullen | 1999-2000 | 81 | 75 | 150 | 5,376,000.00 |
9 | darkhuang M.I.P (ridf-I) | Muallungthu | 1999-2000 | 107 | 100 | 200 | 5,965,000.00 |
10 | Banglalui M.I.Project ( ridf-5) | Phullen | 2000-2001 | 29 | 25 | 50 | 1,797,000.00 |
11 | Pi Dari Lui M.I.Project (ridf-5) | Darlak | 2000-2001 | 106 | 100 | 200 | 6,875,000.00 |
12 | Selutar M.I.Project. ( ridf-7) | Lengpui | 2001-2002 | 23 | 20 | 40 | 1,975,000.00 |
13 | Likphai M.I.Project, Extn.( ridf-8) | Sialsuk | 2002-2003 | 25 | 22 | 44 | 2,213,000.00 |
14 | Tuirini M.I.Project. (aibp-2) | Khumtung | 2002-2003 | 45 | 40 | 80 | 8,390,000.00 |
15 | Dialdawk M.I.Project. (ridf-10) | Lengpui | 2003-2004 | 15 | 12 | 26 | 2,303,000.00 |
16 | Tuirini M.I.Project. (ridf-10) | Seling,Thingsulthliah | 2004-2005 | 20 | 17 | 40 | 2,628,000.00 |
17 | Sailam M.I.Project (aibp-3 ) | Sialsuk | 2005-2006 | 40 | 35 | 70 | 6,813,000.00 |
18 | Tawkzawl M.I.Project (aibp-3) | Phuaibuang | 2005-2006 | 17 | 12 | 24 | 2,696,500.00 |
19 | Vailui M.I.Project (aibp-3) | Sihphir | 2005-2006 | 30 | 25 | 50 | 1,239,500.00 |
20 | Middle Dialdawk M.I.P.(aibp-4) | Lengpui | 2005-2006 | 45 | 39 | 98 | 6,371,000.00 |
21 | Darlak MIP.Ph-11 (aibp-4) | Darlak | 2005-2006 | 28 | 25 | 61 | 6,494,000.00 |
22 | Vaipuanpho M.I.Project (aibp-4) | Ailawng | 2005-2006 | 34 | 30 | 70 | 5,753,000.00 |
23 | Hratlui M.I.Project. (ridf-12) | Phunchawng | 2006-2007 | 20 | 15 | 22 | 1,529,000.00 |
24 | Saitluk M.I.Project (aca) | Dapchhuah | 2006-2007 | 42 | 35 | 70 | 5,785,000.00 |
25 | Damdiai M.I.Project. (ridf-12) | Sesawng | 2007-2008 | 25 | 19 | 48 | 4,715,000.00 |
26 | Sakeilui M.I.P. Ph-I (aibp-4) | Tlangnuam | 2007-2008 | 41 | 30 | 90 | 8,476,000.00 |
27 | Laului M.I.Project (aibp-4) | Sailam | 2007-2008 | 62 | 55 | 97 | 8,536,000.00 |
28 | Leisang M.I.Project (aibp-4) | Muallungthu | 2007-2008 | 42 | 36 | 62 | 5,349,000.00 |
29 | Maukawi lui M.I Project (aibp-5) | Lengpui | 2007-2008 | 40 | 35 | 75 | 7,419,000.00 |
30 | Sakeilui M.I.P. Ph-1I (aibp-5) | Tlangnuam | 2007-2008 | 35 | 30 | 89 | 8,759,000.00 |
31 | Chhimluang MIP (aibp-5) | Saitual | 2007-2008 | 57 | 54 | 140 | 13,072,000.00 |
32 | Dillui M.I.Project (aibp-5) | Sakawrdai | 2007-2008 | 40 | 40 | 85 | 8,377,000.00 |
33 | Tuichar M.I.Project (aibp-5) | Lungpher | 2007-2008 | 46 | 45 | 90 | 8,515,000.00 |
34 | Melthumlui M.I.Project (aca) | Rangvamual | 2007-2008 | 31 | 24 | 56 | 5,615,000.00 |
35 | Pharbawk M.I.Project (aca) | Tlangnuam | 2007-2008 | 28 | 25 | 53 | 3,750,000.00 |
36 | Phekphelui M.I.Project (State) | Sesawng | 2007-2008 | 18 | 12 | 24 | 2,735,100.00 |
37 | Sunhluzawl MIP Ph-11(aibp-5) | West Phaileng | 2007-2008 | 45 | 45 | 100 | 9,355,000.00 |
38 | Setlak MI Project (aca ) | Lengte | 2007-2008 | 30 | 25 | 53 | 3,705,000.00 |
39 | Sihdarh M.I.Project (aibp-6) | Saitual | 2008-2009 | 52 | 50 | 115 | 13,106,000.00 |
40 | Sathanglui M.I.Project (aibp-6) | Thingsul | 2008-2009 | 51 | 50 | 90 | 10,114,000.00 |
41 | Kaihzawl M.I.Project (aibp-6) | Keifang | 2008-2009 | 85 | 80 | 190 | 20,180,000.00 |
42 | Nghaltan M.I.Project (aibp-6) | Lawipu | 2008-2009 | 40 | 35 | 77 | 9,210,000.00 |
43 | Hmawngsih Zau M.I.Project (aibp-6) | W.Phaileng | 2008-2009 | 60 | 45 | 95 | 11,560,000.00 |
44 | Rawkai M.I.Project (aibp-7) | Tlungvel | 2008-2009 | 75 | 60 | 125 | 15,109,000.00 |
45 | Upper Dialdawk M.I.Project (aibp-7) | Lengpui | 2008-2009 | 45 | 40 | 65 | 8,572,000.00 |
46 | Lower Thangzailui M.I.Project (aibp-7) | Tlangnuam | 2008-2009 | 25 | 21 | 40 | 5,038,000.00 |
47 | Thliarpui M.I.Project (aibp-7) | Tlungvel | 2008-2009 | 25 | 15 | 31 | 3,980,000.00 |
48 | Thenzawl M.I.Project (aibp-7) | Phullen | 2008-2009 | 100 | 80 | 205 | 25,405,000.00 |
Sl. No | Name of Projects | Location of Project | Year of completion | G.C.A | C.C.A. | I. P. C | Cost |
Ha. | Ha. | Ha. | Rs. | ||||
49 | Vaipuanpho M.I.Project, Ph-II (aibp-7) | Ailawng | 2008-2009 | 65 | 60 | 105 | 11,500,000.00 |
50 | Selum M.I Project( Aibp-8) | Samlukhai | 2009-2010 | 43 | 40 | 100 | 14,000,000.00 |
51 | Khuangthlihnar M.I Project( aibp-8) | Sialsiuk | 2009-2010 | 28 | 25 | 65 | 9,100,000.00 |
52 | BrigadeKhiangthelh M.I P(aibp-8) | Bawngkawn | 2009-2010 | 16 | 15 | 45 | 6,300,000.00 |
53 | Dakla Zau M.I Project(aibp-8) | Sihphir | 2009-2010 | 33 | 30 | 75 | 8,700,000.00 |
54 | Sairilzo M.I Project(aibp-8) | Lengpui | 2009-2010 | 40 | 36 | 76 | 7,900,000.00 |
55 | Chhirdem M.I Project(aibp-8) | Thanglailung | 2009-2010 | 27 | 25 | 69 | 10,200,000.00 |
56 | Kawngbo M.I Project(aibp-8) | Phullen | 2009-2010 | 55 | 50 | 130 | 15,500,000.00 |
57 | Prozekmual M.I.Project (aibp-8) | Lungleng | 2010-2011 | 65 | 60 | 140 | 10,900,000.00 |
58 | Lobelthleng ram.M.I.Project (aibp-8) | Pehlawn | 2010-2011 | 43 | 35 | 85 | 8,400,000.00 |
59 | Gosen Thuikhurmual M.I.Project(aibp-8) | Tlangnuam | 2010-2011 | 32 | 27 | 62 | 7,300,000.00 |
60 | Damve M.I.Project (aibp-8) | Lengpui | 2010-2011 | 37 | 30 | 70 | 8,600,000.00 |
61 | Pharbawk M.I.Project,Ph-II(aibp-8) | Tlangnuam | 2010-2011 | 40 | 35 | 85 | 9,300,000.00 |
62 | Dampalui M.I.Project (aibp-8) | W.Phaileng | 2010-2011 | 60 | 57 | 137 | 13,900,000.00 |
63 | Fuanlui M.I.Project (aibp-9) | Chite, Aizawl | 2010-2011 | 40 | 35 | 75 | 8,500,000.00 |
64 | Lunghret M.I.Project (aibp-9) | Tuirial | 2010-2011 | 25 | 73 | 8,870,000.00 | |
65 | Bawltephul M.I.Project (aibp-9) | Lamchhip | 2011-2012 | 90 | 60 | 125 | 15,000,000.00 |
66 | Buhchangdil M.I.Project (aibp-9) | Phuaibuang | 2011-2012 | 50 | 45 | 100 | 12,340,000.00 |
67 | Changte M.I.Project (aibp-9) | Samlukhai | 2011-2012 | 80 | 62 | 130 | 14,600,000.00 |
68 | Leihlawnsang M.I.Project (aibp-9) | Lengte | 2011-2012 | 60 | 50 | 134 | 18,433,000.00 |
69 | Sarualzawl M.I.Project (aibp-9) | Maite | 2011-2012 | 90 | 60 | 120 | 13,592,000.00 |
70 | Tuikual M.I.Project (aibp-9) | Saithah | 2011-2012 | 50 | 32 | 72 | 10,000,000.00 |
71 | Tuiphu M.I.Project (aibp-9) | E.Phaileng | 2011-2012 | 48 | 40 | 90 | 10,298,000.00 |
72 | Zawlpalram M.I.Project (aibp-9) | Tachhip | 2011-2012 | 50 | 35 | 75 | 11,180,000.00 |
73 | Zilngai M.I.Project (aibp-9) | Tlungvel | 2011-2012 | 55 | 50 | 125 | 18,670,000.00 |
74 | Dihmunzawl M.I.Project (aibp-10) | Maubawk | 2011-2012 | - | 40 | 96 | 13,845,000.00 |
75 | Zawngram M.I.Project (aibp-10) | Sakawrtuichhun | 2011-2012 | - | 70 | 165 | 17,734,000.00 |
76 | Zotuilui M.I.Project (aibp-10) | Durtlang | 2011-2012 | - | 20 | 36 | 4,693,000.00 |
77 | Tuiritai M.I.Project (aibp-10) | Sumsuih | 2011-2012 | - | 45 | 137 | 20,435,000.00 |
78 | Hliappui M.I. Project (Ridf-21) | Lengte | 2016-2017 | 57 | 52 | 84 | 12,903,000.00 |
79 | Lower Tuiphu MI Project (RIDF-22) | Khawruhlian | 2018-2019 | 45 | 33 | 69 | 8,244,000.00 |
Total of Aizawl Sub Division | 79 | 3,307 | 3,024 | 6,674 | 663,831,300 | ||
ii) Serchhip Sub-Division | |||||||
1 | Lumtui M.I.Project | Serchhip | 1989-1990 | 106 | 100 | 200 | 4,710,807.00 |
2 | Sihpuk M.I.Project | Serchhip | 1993-1994 | 15 | 11 | 22 | 680,500.00 |
3 | Mualvawm M.I.Project | Serchhip | 1994-1995 | 21 | 20 | 40 | 887,300.00 |
4 | Tuirum M.I.Project | Chhiahthlang | 1999-2000 | 39 | 35 | 70 | 1,900,400.00 |
5 | Hlawnkawng M.I.Project | N.Vanlaiphai | 1999-2000 | 36 | 35 | 70 | 2,003,600.00 |
6 | Tuisen M.I.Project (ridf-5) | Mat Valley | 2000-2001 | 28 | 25 | 50 | 1,120,000.00 |
7 | Tuirum M.I.P. Phase-II (ridf-7) | Chhiahthlang | 2001-2002 | 12 | 10 | 20 | 481,000.00 |
8 | Varhva M.I.Project (ridf-7) | Chekawn | 2001-2002 | 32 | 30 | 60 | 4,051,000.00 |
9 | Zuangleng M.I.Project (aibp-2) | Mat Valley | 2003-2004 | 165 | 160 | 320 | 12,500,000.00 |
10 | Thalbullui M.I.Project (aibp-3) | Chekawn | 2005-2006 | 45 | 40 | 80 | 7,480,000.00 |
11 | Kaihthlak M.I.Project (aibp-3) | Keitum | 2005-2006 | 20 | 15 | 30 | 3,984,000.00 |
12 | Zuva M.I.Project (aibp-3) | Leng | 2005-2006 | 50 | 45 | 90 | 10,336,000.00 |
13 | Lungzawl M.I.Project (aibp-3) | Bungtlang | 2005-2006 | 40 | 35 | 70 | 7,666,000.00 |
14 | Sertawklui M.I.Project (aibp-3) | Bungtlang | 2005-2006 | 20 | 15 | 30 | 5,094,100.00 |
15 | Upper Tuisen M.I.Project (aibp-3) | Serchhip | 2005-2006 | 15 | 10 | 20 | 4,636,500.00 |
16 | Thuhruk Tuisen MIP.Ph-II(aibp-4) | Serchhip | 2005-2006 | 22 | 20 | 45 | 3,836,000.00 |
17 | Mualvawm M.I.P. Ph-II (aibp-4) | Serchhip | 2005-2006 | 13 | 10 | 24 | 1,654,000.00 |
18 | Sasawlui M.I.Project (aibp-4) | N.Vanlaiphai | 2005-2006 | 33 | 30 | 62 | 2,699,000.00 |
19 | Zawngtah M.I.Project (ridf-10) | E.Lungdar | 2005-2006 | 40 | 35 | 75 | 7,444,900.00 |
Sl. No | Name of Projects | Location of Project | Year of completion | G.C.A | C.C.A. | I. P. C | Cost |
Ha. | Ha. | Ha. | Rs. | ||||
20 | Luitedam M.I.Project (aca) | Mat Valley | 2006-2007 | 28 | 25 | 58 | 4,589,000.00 |
21 | Sesih MIP (aibp-5) | Chhiahtlang | 2007-2008 | 60 | 60 | 140 | 10,070,000.00 |
22 | Upper Zawngtah M.I.P (aibp-4) | E.Lungdar | 2007-2008 | 57 | 50 | 96 | 9,059,000.00 |
23 | Zehtet M.I.Project (aibp-4) | Mat Valley, Serchp | 2007-2008 | 24 | 20 | 38 | 3,662,000.00 |
24 | Zote Thuhruk, Ph-IM.I.P (aibp-4) | Mat Valley, Zote | 2007-2008 | 34 | 30 | 75 | 6,747,000.00 |
25 | Zuva M.I.Project (aibp-5) | Leng | 2007-2008 | 60 | 60 | 65 | 11,860,000.00 |
26 | Lungzawl M.I.P, Ph -11 (aibp-5) | Bungtlang | 2007-2008 | 30 | 30 | 65 | 5,624,000.00 |
27 | Chamdur MIP (aibp-5) | Mat Valley | 2007-2008 | 60 | 60 | 115 | 11,887,000.00 |
28 | Samaksih MIP (aibp-5) | Bungtlang | 2007-2008 | 60 | 60 | 120 | 7,680,000.00 |
29 | Zote mat M.I.Project (aibp-5) | S.Zote | 2007-2008 | 30 | 30 | 55 | 5,300,000.00 |
30 | Tuisen MI Project (ridf-12) | Mat vall, s.zote | 2007-2008 | 20 | 20 | 50 | 3,149,000.00 |
31 | Buanhnawk M.I.Project, Ph-I | Bungtlang | 2008-2009 | 45 | 36 | 71 | 7,100,000.00 |
32 | Upper Varhva M.I.Project | Mualcheng | 2008-2009 | 97 | 80 | 140 | 13,400,000.00 |
33 | Lungva M.I.Project | Mualcheng | 2008-2009 | 62 | 50 | 100 | 9,000,000.00 |
34 | Khuangbim M.I.Project(aibp-8) | Piler | 2009-2010 | 40 | 35 | 55 | 5,860,000.00 |
35 | Tuichar M.I.Project(aibp-8) | Serchhip | 2009-2010 | 95 | 80 | 150 | 13,300,000.00 |
36 | Savawmkawlui M.I.P(aibp-8) | Chhiahtlang | 2009-2010 | 50 | 45 | 90 | 8,800,000.00 |
37 | Upper Lumtui M.I.Project(aibp-8) | Keitum | 2009-2010 | 40 | 35 | 65 | 6,200,000.00 |
38 | Maudarh M.I.Project(aibp-8) | Serchhip | 2009-2010 | 50 | 40 | 87 | 7,400,000.00 |
39 | Zatlan M.I.Project(aibp-8) | Chhiahtlang | 2009-2010 | 55 | 50 | 100 | 8,900,000.00 |
40 | Lumtui M.I.Project(aibp-8) | Keitum | 2009-2010 | 190 | 180 | 280 | 22,100,000.00 |
41 | Kumkhel M.I.Project (aibp-8) | Chhingchhip | 2010-2011 | 65 | 60 | 112 | 11,000,000.00 |
42 | Lower Varhva M.I.Project (aibp-8) | Khawlailung | 2010-2011 | 65 | 60 | 110 | 10,300,000.00 |
43 | Saisarih M.I.Project (aibp-8) | Sailulak | 2010-2011 | 85 | 80 | 160 | 15,900,000.00 |
44 | Sihdarh M.I.Project (aibp-8) | Lungdar | 2010-2011 | 55 | 50 | 100 | 7,740,000.00 |
45 | Tuikum M.I.Poject (aibp-8) | Serchhip | 2010-2011 | 52 | 50 | 100 | 9,260,000.00 |
46 | Manta M.I.Project (aibp-8) | Chhipphir | 2010-2011 | 54 | 50 | 100 | 9,900,000.00 |
47 | Tuiput M.I.Project (aibp-8) | Serchhip | 2010-2011 | 90 | 80 | 100 | 10,400,000.00 |
48 | Sakhiawt M.I.Project (aibp-9) | Thenzawl | 2010-2011 | 75 | 40 | 75 | 5,852,000.00 |
49 | Dilram M.I.Project (aibp-9) | Hualtu | 2011-2012 | 90 | 60 | 140 | 13,200,000.00 |
50 | Phaisen M.I.Project (aibp-9) | Hmuntha | 2011-2012 | 80 | 40 | 95 | 9,400,000.00 |
51 | Mat M.I.Project (aibp-10) | Serchhip | 2011-2012 | - | 176 | 370 | 55,400,000.00 |
52 | Chhura Bahrasuklui M.I. Project (Ridf-21) | N. Vanlaiphai) | 2017-2018 | 50 | 40 | 52 | 9,830,000.00 |
53 | Tuihnial MI Project (Ridf-22) | Thenzawl | 2018-2019 | 45 | 40 | 59 | 9,988,000.00 |
Total of Serchhip Sub Division | 53 | 2,745 | 2,583 | 4,966 | 443,022,107 | ||
Total of Aizawl Division | 132 | 6,052 | 5,607 | 11,640 | 1,106,853,407.00 |